Hiring an excavation contractor in Texas
Gradeline lists 2,601 excavating and site work contractors in Texas across 204 counties. This guide covers the Texas rules that affect a dig: frost depth and 811 notice through Texas 811.
What to know before you hire in Texas
4.6★
Know what a good rating looks like here
Texas contractors average 4.6 stars on Google. Shortlist crews at 4.5 or better with a solid review count (427 qualify), and treat anything under 4.0 as a red flag.
12 in
Footings go below the frost line
Frost reaches about 12 inches in Texas. Any bid for footings, foundations, or buried lines should dig at least that deep. If the depth is not written in the quote, ask.
2 days
Utilities get marked before digging
Texas law requires 2 business days notice to Texas 811 before any digging. Ask whether your contractor files the request, and plan the start date around the wait.
26%
Most listed contractors have no website
Only 26% of listed Texas contractors run their own site. Judge them on reviews, photos, and years in business rather than web polish, and get at least three written quotes.
Get quotes from Texas contractors in one request.
Get free quotesArea-specific FAQ
How far in advance do I need to call before digging in Texas?
At least 2 working days. Texas 811 takes locate requests statewide and has underground utilities marked before any excavation. Hitting an unmarked gas or power line can injure the crew and lead to costly repairs.
How deep do footings need to be in Texas?
In Texas, footings typically need to extend below the frost line, which is around 12 inches here. A local contractor will confirm the code requirement for your site.
When is the best time of year to dig in Texas?
Most of the year works in Texas. Occasional winter freezes can firm up the top few inches of soil, but the 12-inch frost line clears quickly.




















