
No reviews yet
Listed on GradeLine
Check the work, service area, and contact facts before you hire.

Jim Wells County, TX Contractor directory
1 verified excavating and site work contractor serving Jim Wells County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 1 contractorSouth Texas brush country sits on the Rio Grande Plain, where deep Quaternary eolian fine sands and loamy fluvial deposits (Duval, Webb, and Frio series) mantle the gravel and caliche of the Pliocene Goliad Formation. Topsoil excavation in the sandy loams is fast, but three hazards dominate site work. First, dense thorny brush, mesquite, huisache, blackbrush acacia, and prickly pear, must be grubbed and shredded before mass grading, and the shallow but tenacious root systems punish careless clearing. Second, caliche and indurated gravel ledges at shallow-to-moderate depth slow utility trenching and septic-field excavation; ripper shanks or rock teeth are routinely specified. Third, the eastern edge of the province grades into smectite-rich clays with high shrink-swell that demand moisture-controlled footings and careful subgrade proof-rolling. Summer heat routinely exceeds 100 degrees F, constraining concrete pours and compaction windows, while convective thunderstorms deliver intense, flash-flood-producing rainfall onto crusted claypan surfaces. Deep sandy profiles drain rapidly, so dewatering is rarely needed away from the coastal bend, but wind erosion control on stripped sands is a constant requirement.
Deep soil mantle; rock refusal rare for standard basement or trench cuts.
Moderate shrink-swell; verify plasticity index on structural fill.
Shallow water table; active dewatering or sumps needed for deep trenching.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Predominantly gentle to rolling slopes suitable for wheeled earthmoving.
Standard gravity absorption fields viable in majority of soil types.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Building code minimum depth for footing frost protection.
0.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Texas 811 at least 2 working days before any digging so underground lines can be marked.
In Texas, footings typically need to extend below the frost line, which is around 12 inches here. A local contractor will confirm the code requirement for your site.
Verified local listings
1 verified listing

No reviews yet
Listed on GradeLine
Check the work, service area, and contact facts before you hire.