
Grit Outdoors, LLC
Moose Lake, MNCarlton County
driveways, erosion control, excavation, retaining walls, site prep
No reviews yet

Site Prep project guide
Everything between raw land and a buildable pad: clearing, stripping, cutting, filling, compaction and the construction entrance.
Key facts
Rules and figures that come up in nearly every site prep quote, with the public source for each one.
| Fact | What it says | Source |
|---|---|---|
| Stormwater permit trigger | Clearing, grading or excavating 1 acre or more requires NPDES stormwater permit coverage and a written SWPPP. | EPA, Stormwater Discharges from Construction Activities (NPDES)As of September 2026 |
| Stabilization deadline | Exposed soil where work stops for 14 or more days must be stabilized within 14 calendar days. | EPA, Construction General Permit (CGP) Frequent QuestionsAs of September 2026 |
| Concrete washout | The federal Construction General Permit prohibits concrete washout wastewater unless it is managed in an appropriate control. | EPA, 2022 Construction General Permit (final permit)As of September 2026 |
| 811 locates | Utility locates through 811 are free and must be requested a few business days before any dig. | Common Ground Alliance, 811 Before You DigAs of September 2026 |
Project guide
Site preparation is the package of work that turns a lot into a place a builder can start. On a typical job that means clearing vegetation, stripping and stockpiling topsoil, cutting or filling to the pad elevation, compacting fill in lifts, cutting in a temporary driveway, and installing the silt fence and gravel entrance the stormwater inspector expects to see. The scope shifts with the ground: a flat suburban infill lot may take two days, while a sloped wooded parcel with poor soil can run weeks and involve undercutting and replacing unsuitable material. Site prep contractors typically coordinate with the surveyor who sets the corners and the geotechnical engineer who signs off on compaction.
GradeLine lists 5,004 site prep contractors.Compare their work and equipment, then confirm availability and service area before requesting a quote.
Listed businesses are based in Moose Lake, Statesville, Moscow, Marathon, Boonville, Seymour, though most crews travel well beyond their home city.
A straightforward residential lot typically runs $3,000 to $15,000 for clearing, stripping and pad grading, with heavily wooded, sloped or poorly drained parcels going well past that. Imported structural fill adds $10 to $30 per cubic yard delivered, and undercutting bad soil is one of the most common change orders on a site prep job.
Ranges are national and approximate; regional labor rates, material prices and site conditions move them in both directions.
A straightforward residential lot typically runs $3,000 to $15,000 for clearing, stripping and pad grading, with heavily wooded, sloped or poorly drained parcels going well past that. Imported structural fill adds $10 to $30 per cubic yard delivered, and undercutting bad soil is one of the most common change orders on a site prep job.
Send the site plan, the survey with pad elevations, any geotechnical or soil report, and the order the trades will arrive so the contractor can leave the site the way the foundation crew needs it.
The main cost items are vegetation and debris on the lot, and whether it is chipped, burned, hauled or buried on site; volume of cut and fill, the lift thickness and compaction spec, and whether a testing lab is required; slope, access, drainage across the lot, weather windows and how much room there is to stockpile. A site visit helps the crew see which ones apply.
Site prep usually runs under the main building permit, but grading, land disturbance and stormwater permits are often separate and must be in hand before the first tree comes down. Lots on a public road need a driveway access permit for the construction entrance.
Pick a state to see the site prep contractors listed there. Most crews travel well beyond their home city, so confirm the service area before requesting a quote.
Contractor directory
5,004 contractors found

Moose Lake, MNCarlton County
driveways, erosion control, excavation, retaining walls, site prep
No reviews yet

Statesville, NCAlexander County
driveways, erosion control, excavation, foundations, grading, land clearing
No reviews yet

No reviews yet

Marathon, WIMarathon County
erosion control, excavation, land clearing, site prep
No reviews yet

Boonville, NCYadkin County
demolition, driveways, erosion control, excavation, foundations, grading
No reviews yet

No reviews yet

Dubuque, IA
demolition, erosion control, excavation, foundations, grading, hauling trucking
35 years in business
No reviews yet

No reviews yet

Whitmire, SCUnion County
concrete flatwork, driveways, excavation, foundations, grading, pond water management
No reviews yet

Burlington, MAMiddlesex County
demolition, driveways, excavation, foundations, grading, septic systems
No reviews yet

Menomonie, WIDunn County
demolition, excavation, hauling trucking, site prep

Scottdale, PAWestmoreland County
demolition, driveways, excavation, grading, land clearing, retaining walls
No reviews yet

No reviews yet


Wilmington, DENew Castle County
demolition, excavation, land clearing, paving prep, site prep
49 years in business
No reviews yet

Tygh Valley, ORWasco County
driveways, excavation, hauling trucking, land clearing, pond water management, septic systems
No reviews yet

Logansport, INCarroll County
excavation, pond water management, site prep
56 years in business

demolition, excavation, land clearing, pond water management, site prep, trenching underground
No reviews yet

Franklin, VASouthampton County
demolition, erosion control, excavation, grading, hauling trucking, pond water management

Wattsburg, PAErie County
demolition, driveways, excavation, hauling trucking, land clearing, pond water management
No reviews yet
Tell us about the job and add photos. A local pro calls you back. Free, and no spam.