Grading project guide
Rough and finish grading for building pads, yards and drainage, so water leaves the site instead of pooling against it.
Key facts
Rules and figures that come up in nearly every grading quote, with the public source for each one.
| Fact | What it says | Source |
|---|---|---|
| Drainage slope at the foundation | The IRC calls for the ground to fall at least 6 inches within the first 10 feet from the house, where the site allows. | International Residential Code, Section R401.3As of September 2026 |
| Stormwater permit trigger | Construction that disturbs 1 acre or more needs NPDES construction stormwater permit coverage and a written SWPPP. | EPA, Stormwater Discharges from Construction Activities (NPDES)As of September 2026 |
| Stabilization deadline | Under the federal Construction General Permit, disturbed soil left idle for 14 or more days must be stabilized. | EPA, Construction General Permit (CGP) Frequent QuestionsAs of September 2026 |
| Operator wages | The median construction equipment operator wage was $28.04 per hour in May 2024 (BLS OEWS). | U.S. Bureau of Labor Statistics, Occupational Outlook HandbookAs of September 2026 |
Project guide
Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.
GradeLine lists 6,861 grading contractors.Compare their work and equipment, then confirm availability and service area before requesting a quote.
Listed businesses are based in , Huntington Beach, Clovis, Manassas, Spring City, Murrysville, though most crews travel well beyond their home city.
Rough grading is typically quoted by the hour for the machine, $100 to $200 for a dozer or skid steer with operator, or by the acre at roughly $1,000 to $5,000 depending on how much earth moves. Regrading a residential yard to fix drainage usually falls between $1,000 and $6,000. Finish grading a pad or lawn area is often priced per square foot, in the $0.50 to $2.50 range.
Ranges are national and approximate; regional labor rates, material prices and site conditions move them in both directions.
Rough grading is typically quoted by the hour for the machine, $100 to $200 for a dozer or skid steer with operator, or by the acre at roughly $1,000 to $5,000 depending on how much earth moves. Regrading a residential yard to fix drainage usually falls between $1,000 and $6,000. Finish grading a pad or lawn area is often priced per square foot, in the $0.50 to $2.50 range.
A grading plan or a simple sketch showing where water should end up is the most useful thing you can send. Point out low spots, existing drains, septic fields, tree roots and anything the machine needs to steer around.
The main cost items are cut and fill balance: whether dirt can be moved on site or has to be hauled in or out; compaction requirements, which decide whether a roller and density testing are on the job; access, the number of grade stakes or survey control points, and topsoil to strip and replace. A site visit helps the crew see which ones apply.
Many cities and counties require a grading permit once the job moves more than a set volume, often 50 cubic yards, or changes drainage toward a neighbor. Disturbing an acre or more triggers a stormwater permit and an erosion control plan in most states.
Pick a state to see the grading contractors listed there. Most crews travel well beyond their home city, so confirm the service area before requesting a quote.
LiveOpening as listings fill in
Contractor directory
6,861 contractors found

excavation, grading, hauling trucking, pond water management, septic systems, site prep




excavation, grading, paving prep, trenching underground

demolition, excavation, grading, land clearing, pond water management

Spring City, TNBledsoe County
demolition, driveways, excavation, foundations, grading, land clearing

Murrysville, PAAllegheny County
demolition, excavation, grading, land clearing, septic systems, site prep
29 years in business

Savage, MNScott County
excavation, grading, hauling trucking, trenching underground

Sheffield, MABerkshire County
demolition, driveways, excavation, grading, land clearing, septic systems
10 years in business

excavation, grading, hauling trucking, trenching underground

Quincy, WADouglas County
driveways, excavation, grading, hauling trucking, land clearing, pond water management
73 years in business

Greene, MEAndroscoggin County
excavation, grading, pond water management, trenching underground



Williston, VTChittenden County
driveways, erosion control, excavation, foundations, grading, land clearing
20 years in business




North Ogden, UTWeber County
excavation, grading, hauling trucking, pond water management, septic systems, site prep
Tell us about the job and add photos. A local pro calls you back. Free, and no spam.