
D H Griffin Wrecking Co
demolition, erosion control, excavation, grading, land clearing, paving prep
67 years in business
No reviews yet

Photo: Rivers Langley SaveRivers (CC BY-SA 3.0) via Wikimedia Commons
Russell County, AL Contractor directory
7 verified excavating and site work contractors serving Russell County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 7 contractorsThe Coastal Plain features deep, unconsolidated marine sands, sandy loams, and terrace alluvium that allow rapid bucket cycling and fast production trenching. However, this ease of tooth penetration is counterbalanced by near-zero sidewall stability in cohesionless sands. Trenching deeper than 4 to 5 feet requires immediate benching, sloping back, or the use of trench boxes to prevent rapid sidewall sloughing. High seasonal water tables are common throughout the flat terrain; shallow water tables (often within 18 to 36 inches of grade) require active dewatering, sump pumps, or well-point systems for deep sewer, storm line, or lift station installation. Saturated fine sands can quickly become "sugar sand" under wheel loads, bogging haul trucks and demanding tracked equipment or temporary timber access mats. Engineered fill pads must be carefully compacted at optimum moisture to achieve density specifications without shearing.
Deep soil mantle; rock refusal rare for standard basement or trench cuts.
Low volumetric expansion risk in native subgrade.
Moderate depth; seasonal wet perched water tables possible in spring.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Mountain/hilly terrain; terracing, benching, and tracked haulers frequent.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Nearest active quarry: 3.5 miles haul distance.(10 active crushed stone/sand operations within 50 miles).
0.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Alabama 811 at least 2 working days before any digging so underground lines can be marked.
In Alabama, footings typically need to extend below the frost line, which is around 12 inches here. A local contractor will confirm the code requirement for your site.
Verified local listings
7 verified listings

demolition, erosion control, excavation, grading, land clearing, paving prep
67 years in business
No reviews yet

Fort Mitchell, ALRussell County
erosion control, excavation, foundations, grading, land clearing, paving prep
33 years in business





No reviews yet