County excavation guide

Ground conditions and project requirements in Fall River County

Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.

Skip to 1 contractor
Soil Regime ProfileEPA Ecoregion 43, 44, 26 (Northern Glaciated Plains, Northwestern Glaciated Plains, Northwestern Great Plains)

South Dakota Glaciated Lowlands, Missouri Breaks & Black Hills Margin

Dominant Soil Order: Mollisols / Entisols / Aridisols / Vertisols
Parent Material: Glacial Till and Lake Sediments in the East; Pierre Shale Badlands and Ogallala Gravel in the West; Black Hills Crystalline Core

South Dakota splits at the Missouri River. The east is glacial: Coteau des Prairies till, prairie-pothole wetlands, and the Redwater-James lowlands, where hydric soils occupy 20-40 percent of the eastern counties, seasonal potholes and high water tables shape every drainage plan, and glacial clays bring modest shrink-swell (2-4 percent). Digging is easy; the recurring issues are wet trenches and frost at 42-48 inches. West of the river the landscape turns to Pierre Shale badlands and buttes: bentonitic shale soils with notorious slope-failure and shrink-swell behavior along the Missouri Breaks (the Pierre clay is the Midwest's worst landslide soil), Ogallala gravel and caliche on the tablelands, and the shallow bedrock of the Cheyenne and White River breaks. The Black Hills margin (Rapid City, Spearfish, Deadwood) adds crystalline core rock and the Red Valley shale swales: steep, rocky, and the only blasting country in the state. Slope is minimal in the east and moderate in the west.

Geographic Footprint:South Dakota's counties (Sioux Falls, Rapid City, Aberdeen, Pierre) split between wet glacial lowlands east of the Missouri and shale-badlands-plus-Black Hills rock west of it: pothole wetlands and 48-inch frost in the east, Pierre shale landslide country and Hills rock in the west.
Geotechnical Baseline

Physical Ground Conditions & Soil Properties

Shallow Bedrock (<50 in)
51.1%of county land area

High likelihood of bedrock refusal; hammer / ripper required for deep utilities.

High Shrink-Swell Clay
43.0%expansive soil

Severe expansive clay; pad lime stabilization or undercut replacement typically required.

Median Water Table Depth
0inches from surface

Shallow water table; active dewatering or sumps needed for deep trenching.

Hydric / Wetland Soils
0.5%hydric coverage

Indicates poor natural drainage and potential jurisdictional wetland pockets.

Steep Terrain (Slope >15%)
24.5%of terrain

Mountain/hilly terrain; terracing, benching, and tracked haulers frequent.

Septic Severe Limitations
85.7%severe rate

High rate of conventional drainfield limitations; engineered or drip systems often required.

Dominant Soil Textures:ClaySilty claySilt loam
Surface Stones / Boulders: 18.8% coverage
Compliance & Permitting

Earthwork Regulations & Permit Thresholds

Stormwater & Erosion Control
SDR100000 Construction General Permit (DANR, effective Nov 1 2023 to Oct 31 2028); construction disturbing one or more acres or part of larger common plan; NOI at least 15 days before start

Administers NPDES stormwater discharge coverage for land-disturbing construction activities.

State Threshold:1.00 Acre
Local Threshold:Follows state
Onsite Wastewater & Utilities
Fall River County Planning and Zoning

Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.

Housing on Septic:55.0%
Soil Evaluation:Percolation test per ARSD 74:53:01:30 (3 holes within 5 ft, plus one 4 ft deeper) before installation; not in disturbed or frozen soil
811 One-Call Requirements
South Dakota One Call (811)

Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).

Licensing & Clearing Permits
Weather & Ecology

Seasonal Constraints & Clearing Windows

Frozen Ground Days
90days / year

Typical days with sub-freezing soil conditions affecting digging.

Wet Season Months
April, May, June, July

Peak precipitation window requiring sediment traps and soil aeration.

Supply Chain & Hazards

Logistics, Aggregate Sources & Geohazards

Aggregate & Material Supply
Oral Pit

Nearest active quarry: 12.9 miles haul distance.(4 active crushed stone/sand operations within 50 miles).

Flood & Hazard Overlay
FEMA 100-Yr Flood:3.1%(100% NFHL digital map coverage)
NWI Wetlands:0.0%jurisdictional coverage
Karst Terrain & Sinkhole Risk: Low

0.0% of county underlain by soluble carbonate rock formations.

HUC8 Primary Watersheds:Beaver, Hat, Upper White, Angostura Reservoir, Middle Cheyenne-Spring
Public conservation land: 0.0% (USGS PAD-US).

Area-specific FAQ

Do I need to call before digging in Fall River County?

Yes. You should contact South Dakota One Call at least 2 working days before any digging so underground lines can be marked.

How deep do footings need to be in South Dakota?

In South Dakota, footings typically need to extend below the frost line, which is around 60 inches here. A local contractor will confirm the code requirement for your site.