
On-Trac LLC.
St. James, MOPhelps County
driveways, excavation, foundations, hauling trucking, land clearing, paving prep

Photo: Stephen Edmonds (CC BY-SA 3.0) via Wikimedia Commons
Phelps County, MO Contractor directory
8 verified excavating and site work contractors serving Phelps County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 8 contractorsMissouri splits into two excavation worlds. The southern Ozark Plateau (Springfield, Salem, and the Current River hills) is chert-and-limestone country: soils are thin, stony clay and cherty silt loam residuum over Paleozoic carbonate, bedrock lies within 50 inches on 15-40 percent of land, and karst is everywhere: springs, losing streams, sinkholes, and cave country that makes every septic system design and stormwater plan site-specific. Slopes run 30-70 percent in the core Ozark counties, so bench cuts, retaining structures and erosion control dominate. The glaciated north (Kansas City to St. Louis along the Missouri River) is gentler: loess-capped till plains, silty clay loam digging, and the state's high shrink-swell clays (5 percent average) that push foundation design into pier-and-beam or grade-beam solutions. The transition belt (Ozark Border and Central Irregular Plains) mixes both: cherty claypan soils, moderate slopes, and the deepest loess deposits along the Missouri. Frost is 32 inches; hydric soils concentrate in the Bootheel's Mississippi alluvium.
High likelihood of bedrock refusal; hammer / ripper required for deep utilities.
Low volumetric expansion risk in native subgrade.
Moderate depth; seasonal wet perched water tables possible in spring.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Mountain/hilly terrain; terracing, benching, and tracked haulers frequent.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Nearest active quarry: 3.5 miles haul distance.(14 active crushed stone/sand operations within 50 miles).
100.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Missouri One Call at least 2 working days before any digging so underground lines can be marked.
In Missouri, footings typically need to extend below the frost line, which is around 36 inches here. A local contractor will confirm the code requirement for your site.
Verified local listings
8 verified listings

St. James, MOPhelps County
driveways, excavation, foundations, hauling trucking, land clearing, paving prep






No reviews yet
