
No reviews yet

Photo: formulanone from Huntsville, United States (CC BY-SA 2.0) via Wikimedia Commons
Copiah County, MS Contractor directory
1 verified excavating and site work contractor serving Copiah County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 1 contractorMississippi is the wet-clay end of the Deep South. The Yazoo Delta (the Delta counties from Memphis to Vicksburg) is Mississippi River alluvium: deep silty clay and clay that digs easily when dry and turns to genuine gumbo when wet, hydric soils on 40-60 percent of land, water tables within inches of grade in spring, and the strongest shrink-swell in the region (smectite clays that crack deeply in summer drought). Utility work here is a seasonal race, and septic systems are commonly engineered (aerobic units, low-pressure dosing) because conventional trenches fail in the alluvial clay. The Black Prairie belt (Columbus, Starkville, Aberdeen) carries calcareous smectite clay over Selma Group chalk: high shrink-swell again, with shallow chalk bedrock in places. The Pine Hills and Red Hills (Jackson, Hattiesburg south and east) are the easy half: sandy loam and sandy clay over Gulf Coastal Plain sediments, low shrink-swell, gentle slopes, and conventional septic systems standard. Loess bluffs line the Delta's eastern edge. Frost is essentially absent; hurricane rainfall loads drive drainage design.
Deep soil mantle; rock refusal rare for standard basement or trench cuts.
Low volumetric expansion risk in native subgrade.
Shallow water table; active dewatering or sumps needed for deep trenching.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Mountain/hilly terrain; terracing, benching, and tracked haulers frequent.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Typical days with sub-freezing soil conditions affecting digging.
Nearest active quarry: 1.3 miles haul distance.(14 active crushed stone/sand operations within 50 miles).
0.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Mississippi 811 at least 2 working days before any digging so underground lines can be marked.
Verified local listings
1 verified listing

No reviews yet