Semper Fi Excavation, LLC
Aurora, MNSt. Louis County
driveways, excavation, grading, hauling trucking, land clearing, pond water management

St. Louis County, MN Contractor directory
31 verified excavating and site work contractors serving St. Louis County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 31 contractorsNorthern Minnesota is the wet end of the state: outwash sand plains, extensive peat bogs, and the granite-greenstone Canadian Shield bedrock of the Arrowhead. Ground conditions split three ways. Sand-plain counties cut fast in loamy sand but stand poorly, so trench boxes are standard. Bog and wetland counties (Clearwater, Beltrami, Lake of the Woods, Koochiching) carry hydric soils on 40-70 percent of land, muck excavation and peat removal are ordinary site work, and water tables run within inches of grade. The Arrowhead counties (St. Louis, Lake, Cook) add the state's only shallow bedrock: Precambrian greenstone, basalt and the Duluth Complex lie within 50 inches on 20-60 percent of land, so rock excavation and blasting appear in most utility bids, with frost reaching the deepest design values in the contiguous states. Shrink-swell is negligible everywhere. The compressed building season concentrates excavation between May and October.
High likelihood of bedrock refusal; hammer / ripper required for deep utilities.
Low volumetric expansion risk in native subgrade.
Shallow water table; active dewatering or sumps needed for deep trenching.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Predominantly gentle to rolling slopes suitable for wheeled earthmoving.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Nearest active quarry: 10.6 miles haul distance.(6 active crushed stone/sand operations within 50 miles).
0.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Gopher State One Call at least 2 working days before any digging so underground lines can be marked.
In Minnesota, footings typically need to extend below the frost line, which is around 100 inches here. A local contractor will confirm the code requirement for your site.
Verified local listings
31 verified listings (showing first 20)

Aurora, MNSt. Louis County
driveways, excavation, grading, hauling trucking, land clearing, pond water management



demolition, driveways, erosion control, excavation, foundations, grading

Hoyt Lakes, MNSt. Louis County
demolition, driveways, erosion control, excavation, land clearing, septic systems
37 years in business

Virginia, MNSt. Louis County
demolition, driveways, excavation, foundations, hauling trucking, land clearing


No reviews yet

driveways, excavation, grading, land clearing, septic systems, site prep


excavation, grading, hauling trucking, trenching underground