
Szabo Construction Co Inc
Postville, IAAllamakee County
demolition, excavation, grading, hauling trucking, pond water management, septic systems

Photo: Jatakuck at English Wikipedia (CC BY-SA 3.0) via Wikimedia Commons
Allamakee County, IA Contractor directory
11 verified excavating and site work contractors serving Allamakee County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 11 contractorsIowa outside the Des Moines Lobe is older ground: the unglaciated Driftless corner in the northeast, the sculpted Loess Hills along the Missouri, and the dissected southern prairies. The Driftless counties (Allamakee, Clayton, Winneshiek, Fayette, Dubuque, Jackson) carry Paleozoic limestone and dolomite close to the surface: shallow bedrock on 20-40 percent of land, sinkhole karst in the uplands, and slopes over 15 percent on 20-40 percent of the terrain, so bench cuts, contour septic lines, and rock excavation are routine. The Loess Hills (Woodbury, Monona, Harrison) are thick wind-blown silt on steep ridges: cut banks stand nearly vertical but erode fast, and grading work means erosion control on every slope. Southern Iowa adds the shallowest bedrock in the state (Mississippian limestone within a few feet in Lucas, Monroe, Appanoose) and tighter clay subsoils. Across all three sub-regions, shrink-swell stays moderate and hydric soils concentrate in river bottoms; the recurring site questions are rock depth, slope stability, and karst.
Deep soil mantle; rock refusal rare for standard basement or trench cuts.
Low volumetric expansion risk in native subgrade.
Shallow water table; active dewatering or sumps needed for deep trenching.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Mountain/hilly terrain; terracing, benching, and tracked haulers frequent.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Nearest active quarry: 8 miles haul distance.(19 active crushed stone/sand operations within 50 miles).
68.2% of county underlain by soluble carbonate rock formations.
Yes. You should contact Iowa One Call at least 2 working days before any digging so underground lines can be marked.
In Iowa, footings typically need to extend below the frost line, which is around 48 inches here. A local contractor will confirm the code requirement for your site.
Verified local listings
11 verified listings

Postville, IAAllamakee County
demolition, excavation, grading, hauling trucking, pond water management, septic systems

Lansing, IAAllamakee County
excavation, grading, pond water management, retaining walls, trenching underground
No reviews yet








