RTF Services - Excavation & Demolition
demolition, erosion control, excavation, grading, hauling trucking, land clearing

Photo: AtlChampion (CC BY-SA 4.0) via Wikimedia Commons
Fulton County, GA Contractor directory
10 verified excavating and site work contractors serving Fulton County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 10 contractorsComposite of shallow rock, steep slope, wetlands, shrink-swell, and water table.
Ground conditions across the Piedmont are defined by highly weathered residual red clays (Cecil and Pacolet series) overlying decomposed crystalline bedrock, commonly termed saprolite. Surface clays exhibit moderate to high plasticity and significant shrink-swell behavior; when wet, subgrade compaction requires strict moisture control and aeration to avoid pumping under heavy wheel traffic. Beneath the upper 2 to 6 feet of plastic clay, excavation transitions into structurally intact but chemically decomposed saprolite. While saprolite digs easily with standard 20-to-30 ton excavators, unweathered granite or gneiss core stones ("boulder balls") and erratic rock pinnacles are frequent surprises. Utility trenches and basement cuts that encounter these unweathered ledges require hydraulic breakers or pre-split ripping. Perched water tables frequently form along the clay-saprolite boundary during winter and spring, demanding site ditching and positive surface drainage before pad proof-rolling.
Moderate rock encounters along ridges and upper slope shoulders.
Moderate shrink-swell; verify plasticity index on structural fill.
Deep water table; dry trenching conditions under normal weather.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Predominantly gentle to rolling slopes suitable for wheeled earthmoving.
Standard gravity absorption fields viable in majority of soil types.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Fulton County Land Disturbance Permit (LDP) + GSWCC certified personnel on site
Typical review timeframe: 21-30 days.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 72 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Building code minimum depth for footing frost protection.
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Axle-weight load restrictions on secondary roads during spring thaw.
Mandatory restriction: April 1 – October 15
Check GADNR biodiversity database for local roost trees.
Nearest active quarry: 14.2 miles haul distance.(11 active crushed stone/sand operations within 50 miles).
Nearest C&D landfill: 16 miles haul.Est. tipping fee: $55.00 / ton.
0.0% of county underlain by soluble carbonate rock formations.
Yes. You should contact Georgia 811 at least 3 working days before any digging so underground lines can be marked.
Verified local listings