Fort Myers Land Clearing Pros
erosion control, excavation, grading, hauling trucking, land clearing, pond water management
Verified

Photo: Ecomerford (CC BY-SA 3.0) via Wikimedia Commons
Lee County, FL Contractor directory
43 verified excavating and site work contractors serving Lee County.
County excavation guide
Use this local research to understand soil, seasonal constraints, permits, and jobsite logistics before choosing a contractor.
Skip to 43 contractorsFlorida's peninsular flatwoods are defined by deep, rapidly draining fine sands (Astatula, Tavares, Apopka series) over a spodic or clayey substratum, with seasonal water tables perched 1 to 3 feet below grade during the June-September wet season. Excavation is fast and low-cost in the upper sand profile, high production trenching with minimal rock. The tradeoffs are trench stability and water: cohesionless fine sand sidewalls collapse without benching, sloping, or trench boxes, and perched water tables require sump dewatering or well points for anything below 4 feet. Stormwater retention and detention pond excavation dominates site work; sand spoil is easy to move but must be kept clear of the pond floor where muck or spodic layers are hit. Phosphate-bearing clay strata common in the central ridge (Polk, Hillsborough) can slow production and hold water above the pit floor. Haul road traffic on saturated sugar sand demands tracked dozers and matting for cranes and concrete trucks.
High likelihood of bedrock refusal; hammer / ripper required for deep utilities.
Low volumetric expansion risk in native subgrade.
Shallow water table; active dewatering or sumps needed for deep trenching.
Indicates poor natural drainage and potential jurisdictional wetland pockets.
Predominantly gentle to rolling slopes suitable for wheeled earthmoving.
High rate of conventional drainfield limitations; engineered or drip systems often required.
Administers NPDES stormwater discharge coverage for land-disturbing construction activities.
Jurisdiction over septic tank permits, soil evaluation perk tests, and drainfield sizing.
Mandatory notice window: 48 hours prior to mechanized earthwork (excluding weekends and legal holidays).
Building code minimum depth for footing frost protection.
Typical days with sub-freezing soil conditions affecting digging.
Peak precipitation window requiring sediment traps and soil aeration.
Nearest active quarry: 9.9 miles haul distance.(17 active crushed stone/sand operations within 50 miles).
76.8% of county underlain by soluble carbonate rock formations.
Yes. You should contact Sunshine State 811 at least 2 working days before any digging so underground lines can be marked.
Verified local listings
43 verified listings (showing first 20)
erosion control, excavation, grading, hauling trucking, land clearing, pond water management
Verified

Estero, FLLee County
demolition, driveways, excavation, grading, hauling trucking, land clearing





driveways, excavation, grading, hauling trucking, land clearing, site prep

St Cloud, FLDesoto County
demolition, erosion control, excavation, grading, hauling trucking, land clearing
25 years in business

excavation, foundations, grading, hauling trucking, land clearing, septic systems

Whiskey Creek, FLLee County
driveways, excavation, foundations, grading, hauling trucking, land clearing

Boyette, FLHardee County
demolition, driveways, erosion control, excavation, grading, hauling trucking

Buckingham, FLLee County
excavation, grading, land clearing, pond water management, site prep
10 years in business

Alva, FLLee County
excavation, grading, paving prep, pond water management, site prep, trenching underground
31 years in business
No reviews yet

No reviews yet


No reviews yet



