ONSLOW GRADING AND PAVING INC logo

ONSLOW GRADING AND PAVING INC

JACKSONVILLE, NC Local service area
New to GradelineGradingSite PrepPaving Prep

Is this your business?

Verify your details, add your own photos, and make sure homeowner calls reach you.

Claim it free

Google rating

Not yet available

Direct contact

No middleman

Established crew

Local contractor

Service area

JACKSONVILLE, NC

About the crew

ONSLOW GRADING AND PAVING INC serves JACKSONVILLE, NC with excavation, site preparation, and related earthwork services. Contact the crew directly to discuss the site, schedule, and project requirements.

Location: 115 ATLAS BROWN DRIVE, JACKSONVILLE, NC 28540

Talk to the crew

Request a quote

Share the project basics with ONSLOW GRADING AND PAVING INC. Your request goes directly to the contractor.

Fast Quote Form

See our Privacy Policy and Terms and Conditions.

Services

Grading

Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.

Site Prep

Site preparation is the package of work that turns a lot into a place a builder can start. On a typical job that means clearing vegetation, stripping and stockpiling topsoil, cutting or filling to the pad elevation, compacting fill in lifts, cutting in a temporary driveway, and installing the silt fence and gravel entrance the stormwater inspector expects to see. The scope shifts with the ground: a flat suburban infill lot may take two days, while a sloped wooded parcel with poor soil can run weeks and involve undercutting and replacing unsuitable material. Site prep contractors typically coordinate with the surveyor who sets the corners and the geotechnical engineer who signs off on compaction.

Paving Prep

Paving preparation is the earthwork under asphalt or concrete: cutting the subgrade to plan, undercutting and replacing soft spots, placing and compacting aggregate base in lifts, and proof rolling with a loaded truck to find anything that pumps before the paving crew shows up. Asphalt is only as good as what is under it, and most premature cracking and rutting traces back to a thin or poorly compacted base rather than the mix. Base thickness runs from about four to six inches of crushed stone under a residential driveway to eight to twelve inches or more under a commercial lot or a road, compacted to 95 percent or better of maximum density, with the surface held to within a fraction of an inch of grade so the asphalt lift is uniform. Prep contractors often also handle the curb subgrade, drainage structures and the connection to existing pavement.

Can't reach this crew?

Tell us about the job and add photos. A local pro calls you back. Free, and no spam.

Request services