J&K Excavation

Verified contractor Bloomington, CA San Bernardino County, CA
New to GradelineExcavationGradingSite Prep

Google rating

Not yet available

Direct contact

No middleman

34 years

In business

Service area

Bloomington, CA

About the crew

J&K Excavation serves San Bernardino County, CA with excavation, site preparation, and related earthwork services. Contact the crew directly to discuss the site, schedule, and project requirements.

Location: 123 Main St, Bloomington, CA, 92316

Talk to the crew

Request a quote

Share the project basics with J&K Excavation. Your request goes directly to the contractor.

Fast Quote Form

See our Privacy Policy and Terms and Conditions.

Services

Excavation

Excavation contractors dig and move earth for foundations, basements, utilities, pools and site cuts. Most residential jobs run on a mini or mid-size excavator paired with a skid steer and a dump truck; larger cuts bring in a dozer or scraper. The price depends less on the size of the hole than on what is in the ground: clay, ledge rock, high groundwater and buried utilities all slow the machine down and change the hauling math. Before the bucket touches dirt the site needs an 811 utility locate, and any trench deeper than five feet needs a protective system under OSHA rules.

Grading

Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.

Site Prep

Site preparation is the package of work that turns a lot into a place a builder can start. On a typical job that means clearing vegetation, stripping and stockpiling topsoil, cutting or filling to the pad elevation, compacting fill in lifts, cutting in a temporary driveway, and installing the silt fence and gravel entrance the stormwater inspector expects to see. The scope shifts with the ground: a flat suburban infill lot may take two days, while a sloped wooded parcel with poor soil can run weeks and involve undercutting and replacing unsuitable material. Site prep contractors typically coordinate with the surveyor who sets the corners and the geotechnical engineer who signs off on compaction.