
Friendly Contracting
Is this your business?
Verify your details, add your own photos, and make sure homeowner calls reach you.
Direct contact
No middleman
Established crew
Local contractor
Service area
Connersville, IN
About the crew
Friendly Contracting serves Connersville, IN with excavation, site preparation, and related earthwork services. Contact the crew directly to discuss the site, schedule, and project requirements.
Location: 3207 Wayne Ave, Connersville, IN 47331
Talk to the crew
Request a quote
Share the project basics with Friendly Contracting. Your request goes directly to the contractor.
Fast Quote Form
Services
Concrete Flatwork
Concrete Flatwork
Concrete flatwork covers everything flat and horizontal: garage and shop slabs, patios, sidewalks, equipment pads and aprons. Most of what determines whether a slab lasts happens before the truck arrives. The subgrade is compacted, a gravel base of about four inches is placed and compacted, forms are set to grade with slope away from the building, and reinforcement, typically wire mesh or #3 or #4 rebar on chairs, is placed. Residential slabs are usually four inches thick and poured at 3,000 to 4,000 psi; anything that will see trucks or equipment goes to five or six inches. Control joints are cut at intervals of roughly two to three times the slab thickness in feet, so about every eight to twelve feet on a four-inch slab, because concrete will crack somewhere and joints tell it where. Concrete needs about seven days before foot traffic and twenty-eight to reach design strength.
Demolition
Demolition
Demolition contractors take down houses, garages, commercial buildings and foundations, then sort and haul what is left. The teardown itself is the fast part; most of the schedule is the paperwork that has to happen first. Gas, electric and water are disconnected and capped at the main, an asbestos survey is completed by a licensed inspector and any friable material is abated before the excavator swings, and the demolition permit is posted. A residential house typically comes down in one to two days with a 30 to 40 ton excavator; hauling and backfilling the hole can take a few more. Selective demolition, such as removing a wing or gutting an interior for a remodel, is priced by labor hours because it is done with hand tools and small machines around what stays.
Excavation
Excavation
Excavation contractors dig and move earth for foundations, basements, utilities, pools and site cuts. Most residential jobs run on a mini or mid-size excavator paired with a skid steer and a dump truck; larger cuts bring in a dozer or scraper. The price depends less on the size of the hole than on what is in the ground: clay, ledge rock, high groundwater and buried utilities all slow the machine down and change the hauling math. Before the bucket touches dirt the site needs an 811 utility locate, and any trench deeper than five feet needs a protective system under OSHA rules.
Grading
Grading
Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.
Land Clearing
Land Clearing
Land clearing removes trees, brush, stumps and roots so a parcel can be built on, farmed, fenced or simply seen. The method drives the price. A forestry mulcher grinds standing brush and small trees into chips in a single pass and leaves the ground surface intact; a dozer with a root rake pushes everything into piles for burning or hauling; an excavator with a thumb pulls stumps and stacks logs. Grubbing, which means pulling stumps and roots, is a separate step from clearing and is required anywhere a foundation, driveway or septic field will go. Selective clearing around trees you want to keep takes more hand work and more time than clearing a lot wall to wall.
Septic Systems
Septic Systems
Septic contractors install and replace the tank, distribution box and drain field that treat wastewater on properties without sewer. Nothing goes in the ground until a soil evaluation or percolation test has been done and the county or state health department has approved a system design; the installer builds to that design and the inspector looks at the open trenches before they are covered. Conventional gravel-and-pipe drain fields are the least expensive where soil drains well, but heavy clay, high water tables and small lots push jobs toward chambers, sand mounds, drip dispersal or an aerobic treatment unit, each with a different price and maintenance schedule. Most states license septic installers separately from general contractors, and many require a pumping and inspection record at property sale.
Site Prep
Site Prep
Site preparation is the package of work that turns a lot into a place a builder can start. On a typical job that means clearing vegetation, stripping and stockpiling topsoil, cutting or filling to the pad elevation, compacting fill in lifts, cutting in a temporary driveway, and installing the silt fence and gravel entrance the stormwater inspector expects to see. The scope shifts with the ground: a flat suburban infill lot may take two days, while a sloped wooded parcel with poor soil can run weeks and involve undercutting and replacing unsuitable material. Site prep contractors typically coordinate with the surveyor who sets the corners and the geotechnical engineer who signs off on compaction.
Equipment capabilities
Can't reach this crew?
Tell us about the job and add photos. A local pro calls you back. Free, and no spam.