CHEROKEE GRADING UTILITY CONTRACTORS INC logo

CHEROKEE GRADING UTILITY CONTRACTORS INC

WOODSTOCK, GA Local service area
New to GradelineGradingSite PrepTrenching Underground

Is this your business?

Verify your details, add your own photos, and make sure homeowner calls reach you.

Claim it free

Google rating

Not yet available

Direct contact

No middleman

Established crew

Local contractor

Service area

WOODSTOCK, GA

About the crew

CHEROKEE GRADING UTILITY CONTRACTORS INC serves WOODSTOCK, GA with excavation, site preparation, and related earthwork services. Contact the crew directly to discuss the site, schedule, and project requirements.

Location: 4390 EARNEY RD SUITE 130, WOODSTOCK, GA 30188

Talk to the crew

Request a quote

Share the project basics with CHEROKEE GRADING UTILITY CONTRACTORS INC. Your request goes directly to the contractor.

Fast Quote Form

See our Privacy Policy and Terms and Conditions.

Services

Grading

Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.

Site Prep

Site preparation is the package of work that turns a lot into a place a builder can start. On a typical job that means clearing vegetation, stripping and stockpiling topsoil, cutting or filling to the pad elevation, compacting fill in lifts, cutting in a temporary driveway, and installing the silt fence and gravel entrance the stormwater inspector expects to see. The scope shifts with the ground: a flat suburban infill lot may take two days, while a sloped wooded parcel with poor soil can run weeks and involve undercutting and replacing unsuitable material. Site prep contractors typically coordinate with the surveyor who sets the corners and the geotechnical engineer who signs off on compaction.

Trenching Underground

Trenching and underground utility contractors open the ground for pipe and conduit, bed and backfill it, and put the surface back. What looks like a straight line on a plan is governed by a few hard numbers: 811 locates before any digging, a minimum cover depth that varies by utility (commonly 18 to 24 inches for electric and gas service, and below the frost line for water), and OSHA's requirement that any trench five feet or deeper have a protective system such as a trench box, shoring or a sloped wall, with a competent person on site. Bedding material under the pipe, compaction of the backfill in lifts and tracer wire on non-metallic pipe are the details that separate a line that lasts fifty years from one that settles and cracks the driveway above it.

Can't reach this crew?

Tell us about the job and add photos. A local pro calls you back. Free, and no spam.

Request services