Alliance Excavating & Stone Works logo

Alliance Excavating & Stone Works

Sweet Valley, PA Serving Luzerne County
New to GradelineDrivewaysErosion ControlExcavationFoundations

Is this your business?

Verify your details, add your own photos, and make sure homeowner calls reach you.

Claim it free

5.00 ★

16 reviews

from Google

Direct contact

No middleman

5 years

In business

Service area

Sweet Valley, PA

About the crew

Alliance Excavating & Stone Works serves Sweet Valley, PA with excavation, site preparation, and related earthwork services. Contact the crew directly to discuss the site, schedule, and project requirements.

Location: Sweet Valley, PA, 18656

Counties served: Luzerne County

Talk to the crew

Request a quote

Share the project basics with Alliance Excavating & Stone Works. Your request goes directly to the contractor.

Fast Quote Form

See our Privacy Policy and Terms and Conditions.

Services

Driveways

Driveway contractors build the surface between the road and the house, from a gravel farm lane to a poured concrete approach, and the base under the surface decides how long any of them last. A typical driveway is excavated to remove topsoil, graded with a crown or cross slope so water runs off, and built up with four to eight inches of compacted crushed stone before the top layer goes on. Where the driveway crosses a roadside ditch it needs a culvert sized by the county, and the connection to a public road is regulated by the road authority. Gravel is the least expensive and needs regrading every year or two; asphalt costs more and needs sealing; concrete costs the most up front and lasts longest if the base and joints are done right.

Erosion Control

Erosion and sediment control keeps disturbed soil on the site and out of storm drains, ditches and neighboring property while construction is under way and until vegetation is established. Under the federal Clean Water Act, any project that disturbs one acre or more needs coverage under a construction stormwater permit and a written plan, commonly called a SWPPP, and many cities set lower thresholds. The physical work is simple and unglamorous: silt fence trenched in along the downhill perimeter, a stone construction entrance so trucks do not track mud onto the road, protection around every inlet, check dams in ditches, and erosion control blanket or hydroseed on slopes. What most owners underestimate is the maintenance: controls have to be inspected after every rain of a quarter inch or more and repaired, and inspectors write violations for torn fence and full silt traps, not for missing paperwork.

Excavation

Excavation contractors dig and move earth for foundations, basements, utilities, pools and site cuts. Most residential jobs run on a mini or mid-size excavator paired with a skid steer and a dump truck; larger cuts bring in a dozer or scraper. The price depends less on the size of the hole than on what is in the ground: clay, ledge rock, high groundwater and buried utilities all slow the machine down and change the hauling math. Before the bucket touches dirt the site needs an 811 utility locate, and any trench deeper than five feet needs a protective system under OSHA rules.

Foundations

Foundation contractors build the part of the structure that carries everything above it into the ground: spread footings below frost depth, stem walls or basement walls, monolithic and slab-on-grade foundations, and pier or grade beam systems where soils are poor. The work follows the stamped plans and the geotechnical report, and it is inspected at fixed points, usually the open footing trench with rebar in place before the pour, then again before the slab and before backfill. Frost depth sets the footing bottom, from about twelve inches in the Gulf states to four feet or more across the northern tier. Waterproofing or dampproofing, a footing drain and free-draining backfill are what keep a basement dry, and they are cheapest to do right while the wall is still exposed.

Grading

Grading is the shaping of ground to a designed elevation and slope. Rough grading moves the bulk of the earth to bring a site close to plan; finish grading dials in the last few inches so a pad is level and a yard sheds water. The number that matters is fall: building codes call for the ground to drop at least six inches in the first ten feet away from a foundation, and a lawn or gravel area needs roughly a two percent slope to drain. Crews do this with a dozer, a skid steer with a grading bar, or a motor grader on larger lots, checked against a laser or GPS grade stake rather than by eye.

Paving Prep

Paving preparation is the earthwork under asphalt or concrete: cutting the subgrade to plan, undercutting and replacing soft spots, placing and compacting aggregate base in lifts, and proof rolling with a loaded truck to find anything that pumps before the paving crew shows up. Asphalt is only as good as what is under it, and most premature cracking and rutting traces back to a thin or poorly compacted base rather than the mix. Base thickness runs from about four to six inches of crushed stone under a residential driveway to eight to twelve inches or more under a commercial lot or a road, compacted to 95 percent or better of maximum density, with the surface held to within a fraction of an inch of grade so the asphalt lift is uniform. Prep contractors often also handle the curb subgrade, drainage structures and the connection to existing pavement.

Pond Water Management

Pond and water management contractors excavate and shape ponds, build or repair the embankment dams that hold them, and cut the ditches, swales and channels that move water across a property. A pond that holds water starts with the soil: it needs a clay core or a compacted clay liner, or a synthetic liner where the ground is sandy or rocky, and the dam is built in compacted lifts with a keyway cut into the original ground. Every pond also needs a way to pass the big storm, usually a principal spillway pipe plus an emergency spillway cut in natural ground, sized for the watershed above it. USDA NRCS publishes free design standards for farm ponds that most contractors follow. Cleanouts, which remove years of silt and reshape banks, are common on older ponds and are priced by the cubic yard removed and where that muck can be spread.

Trenching Underground

Trenching and underground utility contractors open the ground for pipe and conduit, bed and backfill it, and put the surface back. What looks like a straight line on a plan is governed by a few hard numbers: 811 locates before any digging, a minimum cover depth that varies by utility (commonly 18 to 24 inches for electric and gas service, and below the frost line for water), and OSHA's requirement that any trench five feet or deeper have a protective system such as a trench box, shoring or a sloped wall, with a competent person on site. Bedding material under the pipe, compaction of the backfill in lifts and tracer wire on non-metallic pipe are the details that separate a line that lasts fifty years from one that settles and cracks the driveway above it.

Equipment capabilities

Excavator

Service area

© OpenStreetMap contributors

Serving Luzerne County, around Sweet Valley, PA.

Answers

Frequently asked

Straight answers from Alliance Excavating & Stone Works.

How much does driveway repair cost in Sweet Valley, PA?

Driveway repair costs vary depending on what the job actually requires. A simple regrading job with stone topping is far less involved than a full excavation with drainage installation. The only honest way to give you a number is to see the driveway. We offer free on-site estimates with no pressure or obligation. Call 570-690-6297 to schedule yours.

What areas do you serve near Sweet Valley, PA?

We serve Sweet Valley, Hunlock Creek, Shickshinny, Back Mountain, Dallas, Harvey's Lake, Huntington Mills, Stillwater, Chase, Tunkhannock, Unityville, and surrounding communities throughout Luzerne, Wyoming, Columbia, Montour, and Sullivan Counties. If you're unsure whether we cover your area, give us a call.

How long does a driveway repair take?

Most residential driveway repairs are completed in one to two days, depending on the size and what the job requires. Larger jobs involving significant excavation, drainage installation, or new driveway construction may take longer. We give you a realistic timeline before we start.

What is driveway regrading and do I need it?

Regrading is the process of reshaping the surface of your driveway so that it sheds water correctly. A properly graded driveway has a slight crown in the center and a gentle slope from high end to low end, so rain runs off to the sides rather than pooling. Over time, driveways settle unevenly and lose this shape. If your driveway holds water after a rain, regrading is often one of the most cost-effective ways to address the problem.

Can you fix water getting into my garage?

Yes. Water intrusion near a garage entrance is almost always solvable through a combination of driveway regrading and trench drain installation at the apron.

Can't reach this crew?

Tell us about the job and add photos. A local pro calls you back. Free, and no spam.

Request services

Similar businesses

Other excavation contractors near you on GradeLine worth comparing.